Stage 2: Hidden Works

Water, electrical, low-voltage, drainage, and concealed lines are checked before closing walls or ceilings.

Service Overview

Hidden works should expose problems before walls are closed.

Once plumbing, electrical, low-voltage, and smart lines are covered, rework becomes expensive. This stage turns outlets, switches, lighting, water lines, drains, and smart wiring into checkable records.

Before closing walls or ceilings, EVO HOME checks utility points, pressure tests, drainage slope, low-voltage planning, smart-system reserves, and photo documentation.

Standardization Points

These points come from the latest presentation materials and existing product and construction systems, and can be expanded into service notes, product lists, or acceptance checklists.

Water and electrical layout
Low-voltage and network lines
Drainage and slope check
Photo documentation

Deliverables

Clients receive more than renderings; they receive executable, checkable, and buildable lists.

Point List

Outlets, switches, lighting, equipment interfaces, and smart control points.

Test Records

Water pressure, drainage, electrical circuits, and safety-configuration checks.

Photo Archive

Concealed line routes recorded before covering for future maintenance.

Workflow

Use process to reduce communication loss, and milestones to control budget, schedule, and delivery quality.

01Review utility points
02Install plumbing, electrical, and low-voltage lines
03Run pressure, power, and drainage tests
04Archive photos
05Confirm before covering

Acceptance and Risk Control

Hidden-work acceptance focuses on safety, maintainability, and avoiding rework after covering.

GFCI/AFCI and safety configurations are confirmed
Hot and cold water plus drainage tests pass
Low-voltage and smart interfaces are reserved
Line-route photos are archived

EVO HOME Method

Hidden works must be documented before they disappear behind finishes.