Stage 3: Base and Finishing Prep
Waterproofing, substrate leveling, tile base, wall repair, and installation benchmarks prepare the site for finishes.
Service Overview
Base work determines whether finish installation can be precise.
Walls, floors, ceilings, waterproofing, and finish bases support all product systems. Uneven bases, inaccurate corners, or weak waterproofing create later problems for cabinetry, doors, wall panels, flooring, and tile.
EVO HOME checks flatness, verticality, slope, waterproofing, board base, and opening positions at this stage.
Standardization Points
These points come from the latest presentation materials and existing product and construction systems, and can be expanded into service notes, product lists, or acceptance checklists.
Deliverables
Clients receive more than renderings; they receive executable, checkable, and buildable lists.
Flat baselines for wall panels, cabinetry, doors, flooring, and tile.
Inside corners, outside corners, openings, waterproof returns, and base photos.
Workflow
Use process to reduce communication loss, and milestones to control budget, schedule, and delivery quality.
Acceptance and Risk Control
Base acceptance helps finished systems install accurately, close cleanly, and last longer.